Prices for kidney shaped fiberglass pools typically range based on size, depth, gel coat color, site access, and installation requirements. This article lays out the cost picture, including total ranges and per-unit rates for the most common scenarios in the U.S., so buyers can budget accurately for a kidney shaped fiberglass pool project.
| Item | Low | Average | High | Notes |
|---|---|---|---|---|
| Pool Shell (kidney shape, 12×24 ft) | $18,000 | $25,000 | $34,000 | Fiberglass shell only |
| Site Prep & Excavation | $1,500 | $4,000 | $8,000 | Grading, utility checks |
| Electrical & Plumbing Rough-In | $2,500 | $5,000 | $9,000 | GFCI, breaker, piping |
| Permits & Inspections | $500 | $1,200 | $2,000 | Regional variation |
| Pool Interior Finish & Accessories | $2,000 | $4,500 | $8,000 | Ladders, trims, skimmers |
| Delivery & Installation Labor | $3,000 | $6,000 | $12,000 | Crane, crew, hoses |
| Warranty & Contingency | $1,000 | $2,000 | $4,000 | 5-year, parts, labor |
Kidney Shaped Pool Price Overview by Size and Finish
Typical total price ranges include the shell, site work, and install labor for a common 12×24 ft kidney shaped fiberglass pool. A smaller 10×20 ft kidney pool may start around $16,000 and top near $28,000, while a larger 14×28 ft model can push toward $40,000 or more depending on upgrades. Fiberglass shells are usually quoted as a single package with optional upgrades for color, slip-resistant decks, and additional accessories. Assumptions: Midwest labor rates, standard shell color, normal access, no major soil issues.
| Size | Low | Average | High | Notes |
|---|---|---|---|---|
| 10×20 ft | $14,500 | $16,500 | $28,000 | Lower end shell, basic install |
| 12×24 ft | $18,000 | $25,000 | $34,000 | Most common size |
| 14×28 ft | $28,000 | $34,000 | $45,000 | Wider footprint, more materials |
What Drives the Kidney Pool Price The Most
Size, depth, and site access are the top cost drivers for kidney shaped fiberglass pools. Larger shells require more foam, more gel coat, and longer install times. Deep options near 6-8 ft add structural complexity and plumbing length. If the yard has limited access, crane availability and additional labor costs can push totals higher. Assumptions: standard soil, level lot, accessible entry.
- Shell thickness and added features
- Decking materials and surface finishing
- Electrical service upgrades and breaker sizing
- Regional permitting stringency and inspection frequency
Component Costs That Show Up on the Quote
A detailed quote breaks costs into major components, helping buyers compare apples to apples. The table below shows typical ranges you’ll see. Per-unit pricing (where relevant) is noted for quick budgeting. Assumptions: standard permits, normal weather delays, no structural remediation.
| Component | Low | Average | High | Notes |
|---|---|---|---|---|
| Pool Shell | $14,000 | $22,000 | $30,000 | Kidney shape fiberglass shell |
| Site Prep | $1,500 | $4,000 | $8,000 | Excavation, grading, soil checks |
| Electrical & Plumbing | $2,000 | $4,500 | $8,000 | Rough-in and connections |
| Decking & Finishes | $3,000 | $6,000 | $12,000 | Concrete, pavers, coping |
| Labor & Equipment | $2,500 | $5,500 | $12,000 | Cranes, crew hours |
| Permits & Inspections | $500 | $1,200 | $2,000 | Local fees |
Variables That Can Change Your Final Quote
Regional labor rates and soil conditions are two numeric drivers that can swing costs by 15-30%. A yard with poor access may require additional crane time and longer setup, while sandy soils reduce excavation effort. If a permit level raises inspections, the price rises accordingly. Assumptions: standard 2-person crew, weekday schedule.
- Region and climate zone
- Soil stability and rock presence
- Craning availability and access width
- Decking material choices and shape refinements
Ways to Reduce the Kidney Shaped Pool Price Without Skimping on Quality
Smart scope choices and planning can shave thousands from the project. Consider choosing a standard shell without color upgrades, consolidate site prep work, or pair pool install with existing landscaping timing. Scheduling outside peak season and bundling permits can also cut costs. Assumptions: mid-range decking and standard equipment.
- Keep to a standard gel coat color and finish
- Bundle electrical upgrades with pool work
- Limit added features like waterfalls or advanced LED systems
- Schedule during off-peak installation windows
Maintenance and Ownership Costs for Kidney Shaped Fiberglass Pools
Ongoing expenses affect the total ownership price over the first 5 years. Expect monthly maintenance, chemical balancing, and seasonal cleaning costs. A basic cover, pump, and filter setup add to the upfront but reduce long-term energy and chemical costs. Assumptions: standard 1HP pump, conventional filtration, normal usage.
| Category | Typical Range | Notes |
|---|---|---|
| Annual Chemical & Cleaning | $200-$800 | Maintenance fluids, test kits, shock |
| Electricity for Pump | $150-$600/year | Depends on pump size and run hours |
| Winterization/Seasonal | $100-$400 | Cover and basic upkeep |
| Repairs & Part Replacements | $300-$1,500 | Heater valves, skimmers, liners |