Digital Database
8×8 Kitchen Remodel: Complete Cost Guide – Adnan Painting and Remodeling
Published: 2026-06-30T08:07:28+00:00 • 3 min read

Prices for an 8×8 kitchen remodel vary widely by scope, materials, and labor. The main cost drivers are cabinets, countertops, appliances, and labor time, with smaller influences from permits and delivery. Cost ranges help buyers set expectations and build realistic budgets.

Item Low Average High Notes
Project Total $8,000 $16,000 $28,000 Basic updates to full gut remodel
Cabinets & Hardware $4,000 $9,500 $18,000 Stock to semi-custom options
Countertops $1,500 $3,800 $6,000 Laminate to quartz or granite
Appliances $3,000 $6,500 $12,000 Entry to mid-range models
Labor $2,000 $5,000 $9,000 Demolition, rough-in, install
Electrical/Plumbing $1,200 $3,000 $5,000 Rewiring, new lines, fixtures

Overview Of Costs

Budget ranges for an 8×8 kitchen remodel show a broad spread based on scope and finishes. A simple refresh with refaced cabinets and new countertops sits toward the low end, while a full gut with custom cabinetry and high-end appliances drives the high end. Assumptions include standard 64 sq ft area, typical ceiling height, and mid-range finishes. This section presents total project ranges and per-unit estimates to help plan a realistic budget.

Cost Breakdown

Breaking down the price clarifies where money goes in an 8×8 remodel. The table below combines total ranges with per-unit context (per square foot and per item where relevant) to reflect common installer practices and material choices.

Cost Component Low Average High Notes
Materials $3,000 $8,000 $14,000 Cabinets, countertops, sinks, fixtures
Labor $2,000 $5,000 $9,000 Demolition, framing, install, finish work
Permits $200 $1,000 $2,000 Local permit fees if required
Delivery/Disposal $300 $1,000 $2,000 Waste removal and material delivery
Appliances $3,000 $6,500 $12,000 Range, fridge, dishwasher, hood
Contingency $1,000 $2,500 $4,000 Typically 5–15% for unforeseen tasks

Factors That Affect Price

Several drivers can shift costs significantly by region and scope. The following factors often determine final pricing for an 8×8 kitchen remodel: material quality, cabinet style, kitchen layout changes, and fixture selections. Labor availability and local codes also influence total time and cost.

Ways To Save

Smart choices can trim up-front costs without sacrificing essential function. Consider refacing existing cabinets, choosing standard-depth appliances, and selecting quartz or solid-surface countertops instead of premium materials. Efficient layouts can reduce labor time, and timing renovations during off-peak seasons may yield lower rates.

Regional Price Differences

Prices vary by region, with noticeable deltas between markets. The table compares three representative regions and the typical delta from national averages for an 8×8 remodel. Assumptions include mid-range finishes and standard permitting processes.

Region Low Average High Notes
West $15,000 $22,000 $34,000 Higher labor and material costs on average
Midwest $12,000 $18,000 $28,000 Relatively balanced pricing
Southeast $11,000 $16,000 $26,000 Lower storm-related material costs in some months

Assumptions: region, specs, labor hours.

Labor & Installation Time

Time requirements influence the labor portion and overall schedule. An 8×8 remodel typically spans 1–3 weeks depending on scope: cosmetic updates compress, full gut remodel extends. Labor hours commonly range from 40–120 hours, with larger projects leaning toward the higher end.

Typical labor factors include layout changes, plumbing reroutes, and electrical work for new appliances. data-formula=”labor_hours × hourly_rate”> Local hourly rates for cabinet installers, electricians, and plumbers vary by market and crew experience.

Additional & Hidden Costs

Hidden costs can surprise if not anticipated early. Common extras include demolition debris disposal, hardware upgrades, extended warranties, and delivery surcharges. Some markets impose disposal fees or lead-time charges for popular appliance models.

Other potential line items: backsplash tile upgrades, water filtration, and under-cabinet lighting. Consider contingencies of 5–15% to cover surprises in electrical, plumbing, or structural adjustments.

Real-World Pricing Examples

Three scenario cards illustrate typical outcomes for an 8×8 kitchen. Each card shows specs, labor hours, per-unit prices, and totals to help frame expectations.

aria-label=”Real-world pricing cards”>
style=”border:1px solid #ccc; padding:8px; margin-bottom:8px;”>
Basic Renovation
Cabinets: stock; Countertops: laminate; Appliances: budget range
  • Spec: 64 sq ft area, standard L-shape layout
  • Labor: 40–60 hours
  • Per-unit: Cabinets $150–$320/linear ft; Countertops $25–$60/ft
  • Total: $8,000–$14,000
style=”border:1px solid #ccc; padding:8px; margin-bottom:8px;”>
Mid-Range Renovation
Cabinets: prefabricated with upgraded hardware; Countertops: quartz
  • Spec: 64 sq ft area, island not included
  • Labor: 70–100 hours
  • Per-unit: Cabinets $200–$420/linear ft; Countertops $50–$80/ft
  • Total: $16,000–$28,000
style=”border:1px solid #ccc; padding:8px;”>
Premium Renovation
Custom cabinetry; Countertops: granite or high-end quartz; High-end appliances
  • Spec: 64 sq ft area with advanced electrical and lighting
  • Labor: 100–140 hours
  • Per-unit: Cabinets $350–$700/linear ft; Countertops $60–$110/ft
  • Total: $28,000–$50,000

Assumptions: region, specs, labor hours.