Typical costs for 3/8 inch drywall hinge on sheet price, labor, finish work, and regional wage differences. The following price ranges reflect common U.S. market rates for materials and installation, with explicit per-sheet and per-square-foot figures. Readers will see how size, finish level, and location drive the final price. Cost and price factors for 3/8 drywall are outlined below to aid budgeting.
| Item | Low | Average | High | Notes |
|---|---|---|---|---|
| 3/8 in drywall sheet (4×8 ft) | $6.50 | $8.50 | $12.00 | Material only; standard gypsum board |
| Labor to install per sheet | $40 | $60 | $90 | Includes hanging and taping prep |
| Finishing (tape, compound, sanding) per sheet | $25 | $40 | $75 | Level 1–3 finish typical |
| Per sq ft installed (installed average) | $1.25 | $2.00 | $3.25 | Materials + labor + finish |
| Delivery/haul-away per project | $25 | $50 | $150 | Depends on distance and volume |
| Removed drywall (per sheet, if replacing) | $5 | $12 | $25 | Includes disposal costs |
| Total project (example 10 sheets + finish) | $400 | $800 | $1,900 | Typical remodel scope |
Cost by sheet size and regional pricing for 3/8 inch drywall
Assumptions: standard 4×8 ft boards, typical rooms, Midwest to Southeast regions, no specialty fire-rated or moisture-resistant boards. Prices include delivery in most markets. Localize with a regional delta of ±20% from the national average. Assumptions: Midwest labor rates, standard materials, normal access.
Low ranges reflect basic material and minimal finishing; high ranges assume extra fasteners, moisture-resistant variants, or complex surfaces. Per-sheet material cost is commonly $6.50–$12.00, with installed per-sheet totals often $40–$90 for labor plus finishing.
Materials, labor, and finish: what makes up a 3/8 drywall quote
Breaking a typical 3/8 sheet project into components helps compare bids. A standard quote may show four major cost blocks: Materials, Labor, Finishing, and Delivery. Understanding these blocks helps identify where you can adjust without compromising structure.
| Component | Low | Average | High | Notes |
|---|---|---|---|---|
| Materials (sheets, screws, backing) | $60 | $120 | $180 | Assumes 20 sheets |
| Labor (hanging) | $800 | $1,200 | $1,900 | Crew of 2–3 over 1–2 days |
| Finishing (taping, mud, sanding) | $300 | $700 | $1,200 | Level 2 or 3 finish |
| Delivery/Disposal | $25 | $50 | $150 | Distance dependent |
| Subtotal before extras | $1,185 | $2,070 | $3,430 |
Coast and metro markets tend to price higher due to labor rates and delivery constraints. The per-sheet installed price in urban coastal regions often lands in the upper 60th percentile relative to national averages, while rural interior markets sit in the lower third. A typical regional delta is roughly $0.75–$1.50 per installed sq ft when comparing regions with similar scope.
For example, a 10-sheet project in a high-cost city may run $1,000–$1,900 in labor and finishing alone, while a similar project in a lower-cost area could be $700–$1,200.
Prices commonly appear as per sheet or per square foot. Per-sheet ranges reflect material and basic labor, while per-square-foot figures aggregate all cost lines. Typical installed ranges are $1.25–$3.25 per sq ft, with finishes and fasteners contributing to the higher end.
| Scenario | Low | Average | High | Notes |
|---|---|---|---|---|
| Standard room, 3/8 in drywall, Level 1 finish | $1.25 | $2.00 | $2.75 | Including materials and labor |
| Moisture/MR board, higher finish (Level 3) | $1.60 | $2.60 | $3.25 | Coastal or humid regions |
| Repair or patch over existing wall, per sheet | $12 | $25 | $40 | Smaller scope |
Finishing adds substantial cost. A Level 2 finish is cheaper than Level 3 or Level 4 (paint-ready) finishes. Expect finishing to add roughly 25–60% of the material and hanging costs. A cleaner, smoother finish requires more time, increasing the price.
Additional coatings or texturing increases price by $0.25–$0.75 per sq ft depending on texture complexity.
Delivery, haul-away, and waste disposal add measurable costs, especially on larger jobs. If walls require special moisture-proofing, fire-taping, or sound-damping layers, expect higher material costs and longer labor times. Site access, stair access, and short lead times can also push totals upward.
| Add-on | Low | Average | High | Impact |
|---|---|---|---|---|
| Moisture-resistant board | $15 | $25 | $40 | Material premium |
| Sound-damping layer | $2 | $5 | $10 | Per sq ft |
| Lead time rush | $0 | $100 | $300 | One-week notice |
Control scope by batching tasks, standardizing finish levels, and choosing standard gypsum board rather than premium moisture-resistant variants where not required. Choosing mid-range finishes and scheduling during off-peak months can reduce costs.
Compare quotes from at least two local installers, verify subcontractor rates, and ask for a materials-only option for self-installation where feasible.
Typical crews include 2–3 workers for hanging and finishing a standard 10–20 sheet project. A 1,000–1,500 sq ft area with Level 3 finish usually takes 2–4 days depending on layout and prep work. Time estimates influence labor cost greatly.
Labor hours often scale with room complexity, ceiling heights, and corner conditions, so factor in extra hours for intricate designs or numerous openings.